PROJECTS
Click images to enlarge
HIGHWAY & RAIL BRIDGE PROJECTS
Austin Bridge and Road, DART Blue Line Extension from Garland to Rowlett. 4.8 miles of bridge construction for.
Bluebonnet Constructors LLC, SH 183, SH 121 and IH 820 North Tarrant County. Construction of Bridges at Ruff Snow over IH820 and Three Bridges at Holiday Lane IH 820. TxDot $1.5 M.
Trinity Infrastructure, IH 35E Bridge Widening at Creek Crossing South of Northwest Hwy. TxDot $1.7 M.
ABR DART Blue Line Extension from Garland to Rowlett. Rowlett Station.
Bluebonnet Construction, SH 183, SH 121 and IH 820 North Tarrant County. MSE and CIP Retaining Walls, Sidewalk, Bridge RipRap.
Trininy Infrastructure, IH-635 and IH-35E RipRap and related flatwork work.
Austin Commercial, BNSF
Headquarters, Fort Worth, TX
144,000 SF of Pavement
Click images to enlarge
CIVIL AND SITE CONSTRUCTION
Click images to enlarge
DART BLUELINE EXTENSION GARLAND TO ROWLETT
Owner: Dart Area Rapid Transit (DART)
General Contractor: Austin Bridge & Road
Work consisted of Bridge Structures 6 structures and site concrete at Downtown Rowlett Station.
Project value: $13.9
Click images to enlarge
COMMERCIAL CONCRETE STRUCTURES
Roger-O'Brien | JE Dunn, a JV, Parkland Hospital Medical / Surgical Clinic Structure. $7.4 M, 225,000 SF
Manhattan Construction Co.: Frisco Multi-Use Center & Dallas Cowboy's World Headquarters. Grade Beams, Elevator Pits and Slab on Grade Preparations, 400,000 SF, $3.6M
MBJ3/MDI, DFWIA Terminal E, Phase 2 New Elevator Pits w/Limited Access Drilled Piers, Infills of existing slab opening, structural slabs at entrances and elevator machine rooms. $1.4 M
SEDALCO: Will Rogers Cattle Barn #2 renovations. $1.4 M
Click images to enlarge
DFW INTERNATIONAL AIRPORT PROJECTS
Terminal A Enhanced Parking Structure BARC/Austin Commercial $14.0 M 81,500 CY Three Phases/Three Years
DFWIA Bus Maintenance Barn Renovation. Phillip-Mays $250K Drilled Piers 8' below existing floor new "Structural Concrete Floor" for new Bus Jacking System.
Terminal E Phase 2 TRIP. MBJ3/MDI Interior Floor Infills, 2 new Elevator Pits and Elevator Machine Room Floors, Roadway Modification. $1.3 M
West Airfield Drive improvements. Austin Bridge & Road $300K. Sidewalks and Rip Rap.
Consolidated Headquarter Structural Slab Foundation, TOH CMAr $1.8 M. 51,500 SF slab on carton forms.
Interior Fireproofing Term A BARC/Alpha Fireproofing.
Click images to enlarge
PARKLAND MEDICAL/SURGICAL CLINIC STRUCTURE CONCRETE
Roger-O'Brien|JE Dunn, a Joint Venture
Turnkey Cast in Place Concrete Structure, 225,000 SF
78 Drill Piers, Avg Depth 95', all doubled cased.
6 Levels of Elevated Structural Slab Partial Basement
Contract Value: $7.4 M
Click images to enlarge
DFWIA TERMINAL E
Construction Manager: MBJ3
General Contractor: MDI
Limited Access Piers, Permanent Castings, between parking deck and building and inside the former TRAM way. Three new elevator pits and one which required the depth increase by 2'. Elevated Structural Concrete at upper level entrance and elevator machine rooms at room level. Infill of abandon slab opening on concourse level. Major modifications to lower level roadway.
Contract Value: $1.4 M
Click images to enlarge
FRISCO EVENT CENTER & COWBOYS WORLD HEADQUARTERS
General Contractor: Manhattan Construction
Owner: City of Frisco for Event Ctr.
Owner: Blue Star Development
EJ Smith Construction furnished and installed the subslab filter fabric, 6" crushed stone drainage layer, 15 mil vapor barrier and formwork for 400,000 SF of area. Excavated, formed, poured 15 elevator pits and grade beams. Backfilled 20' retaining walls and all grade beams and pits.
Contract Value: $3.6 M